I have been working on balancing the batteries packs and have got the heater working we have taken out one bad batteries and replaced it with a good one.
Electric Vue conversion 2.0
Tuesday, May 31, 2016
I have been working on balancing the batteries packs and have got the heater working we have taken out one bad batteries and replaced it with a good one.
Friday, May 13, 2016
This week we've been working on the final touches on getting the vehicle ready to drive to drain all the batteries down to bottom balance them. I have figured out the problem with the power steering the two purple wires coming out of the ECU plug need to tied together and the attached to the purple in the new controller. The same has to be done with the pink wire. The other thing I did this week is strapping down the front battery pack to keep them in place to do that since we've added insulation to it is to drill new holes for the bolts to go through on the side instead of on the bottom how it was originally designed





Me and dathan have been working on finishing the car. I have installed the heater extension cords and have tested all of the batteries, blocked the middle heat vent and started to put the back of the vehicle together
Friday, April 29, 2016
battery packing
This week Victor and I have been working hard and putting overtime on getting the new batteries packed to be installed into the front battery box. Aside this week Victor and I also were changing the back callipers on the school van. Victor and I also changed tiers on Rays truck.
This week Victor and I have been working hard and putting overtime on getting the new batteries packed to be installed into the front battery box. Aside this week Victor and I also were changing the back callipers on the school van. Victor and I also changed tiers on Rays truck.
Thursday, April 28, 2016
Front Bumper and Wiring.
Wednesday, April 27, 2016
This week I have been working on adding metal to cover the cracks in the floor in the back so far I have two cut out of four and one secured. I have also been working on putting the battery packs together with Dathan. To day I was putting new brake callipers, break disc and pads on the school van.
Friday, April 8, 2016
This week I secured the charger port to the car. I also started to attach a cover for the back which will be welled to the car. I was also testing the batteries voltages through out the pacts, and we charged the packs for the first time with the charge port.